Leg Up Farm

Site Work Begins! August 2009

Sign Goes Up
Stakes Go In
Pre-Construction Shot
Pre-Construction Shot

Pre-Construction Shot
Driveway Begins
Backhoe On-Site
Clearing Trees

Silt Fencing
Brooke's Site Visit
Retention Basin Started
Looking Northeast

Stormwater Conveyance Piping
Site Grading Equipment
Looking Southwest
Start Your Engines

Building Corner Stakes
BIG Tires on Grader
Compaction Equipment
Driveway Entrance off North Sherman Street Extended


©2012 Leg Up Farm. All Rights Reserved.
Website Design & Hosting
Provided By: CTI Networks, Inc.

4880 N. Sherman Street
Mt. Wolf, PA 17347-9637
P: (717) 266-9294

  • leg up farm

     

    lightbox
    http://www.legupfarm.org/wp-content/uploads/slideshow-gallery-pro/slide_2.png

    leg up farm

  • leg up farm

     

    lightbox
    http://www.legupfarm.org/wp-content/uploads/slideshow-gallery-pro/slide_1.png

    leg up farm

  • leg up farm

     

    lightbox
    http://www.legupfarm.org/wp-content/uploads/slideshow-gallery-pro/slide_3.png

    leg up farm

  • leg up farm

     

    lightbox
    http://www.legupfarm.org/wp-content/uploads/slideshow-gallery-pro/slide_4.png

    leg up farm

Courage to Dream Capital Campaign
  • Home
  • About Us
    • Louie’s Story
    • Board Of Directors
    • Who We Serve
    • Careers
    • Meet Our Animals
  • Matthew’s Town
  • Therapy Services
    • Circle of Care
    • Referral And Assessment Process
    • 2012 Summer Camp
  • Community
    • Volunteer
    • Donate
    • Ways To Give
    • Needs List
    • Facility Rental
  • News
    • Press Releases
    • Photo Gallery
  • Social Media
    • Blog
    • Facebook
    • YouTube
  • Contact Us